Flanged Underfloor Scaffolding System is a scaffolding system used as carrier scaffolding in reinforced concrete structures or as working scaffolding in various structures. The flanged underfloor scaffolding system consists of 4 main materials: vertical element, horizontal element, lower setting and upper setting. In particular, the level differences on the floor or the floor can be solved very easily with this system. It is easy to install, transport and stock. It can be easily shaped according to the structure. It takes its name from the flanges on the vertical members and by locking the dovetails and wedges on the heads of the horizontal members to these flanges, the scaffold is rigidly locked. Locking mechanisms placed at 50 or 100 cm intervals on vertical elements are the connection points of horizontal elements.
The flanged underfloor scaffolding system is used as a carrier scaffold in all reinforced concrete structures, as well as preferred in industrial facilities, oil refineries, shipyards, constructions, entertainment sectors and concert or sports areas where temporary grandstands are needed. Our steel products are dipped painted. In addition, upon request, our products can be dip galvanized according to TS 914 EN ISO 1461 standards. Flanged Scaffolding System is a certified product in compliance with TS – EN 12810 norms.
SYSTEM FEATURES:
It is practical to install, saves labor and time. It is easily installed and dismantled with a single hammer blow. Since no fastener is used, it saves time, labor and cost.
No connection element is required for the connection to the flange apparatus on the vertical elements. Connection is easy with the dovetail system on horizontal connections.
Level differences on the floor or floor can be easily resolved with this system. TS EN 74-3 certified lower adjustment spindles are used to level the floor, and 4-way or U-headed upper adjustment spindles are used to take the balance under the floor and beam.
It can be used safely at the desired height and width.
Walking platforms are produced with perforated holes for safety. Walking platforms are securely mounted to the system with a special connection lock.
It has a carrying capacity of 6 tons when the horizontal element is connected between the uprights at 0.5 meter intervals.
TS EN 12810-1 certified flanged vertical elements are produced as standard 48/3mm and horizontal elements 48/2.5mm from TSE certified industrial pipes subjected to mechanical tests.
Robotic cutting, drilling and welding processes are applied in our productions.
Each element is produced automatically by gas welding robotic machines.